
New TopShim run:

version = topshim 2.0.0
date = 2023-11-14
time = 17:38:29.482
command = topshim  convcomp tuneaxyz

1D SHIMMING

Parameters:

maximum order = 5
probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm
optimisation parameters = ls
linewidth 1H = 0.10 Hz
envelope shape / strictness = 2.00 / 200

Results:

tune lock level increase = 1.5

initial B0 stdDev = 2.80 Hz
sample size = 2.88 cm, position = -0.01 cm
final B0 stdDev = 0.33 Hz > improvement = 8.5
envelope width = 0.59 Hz

Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	+59
Z2	-39
Z3	+118
Z4	-220
Z5	+29
X	-58
Y	+133

duration = 3 min 52 sec
completed successfully
finished Tue Nov 14 17:42:20 2023


========================================================================
